:: SERAIKELA KHARSAWAN LICENSE AREA

SERAIKELA KHARSAWAN LICENSE AREA

(First district in the country where two utilities have been allowed to build parallel network for distribution of power)

The Seraikela-Kharsawan district of Jharkhand is contiguous to JUSCO’s service area of Jamshedpur. With the Electricity Act opening up power distribution to the private sector, JUSCO applied for and was granted a distribution licence for the area in 2006. It began distribution of power in October 2007, after having established seven new sub-stations of 90 MW capacity each.

Infrastructure established:
132 kv double circuit Transmission Line.
132/33 kv Main Grid Substation.
33 kv Transmission Lines & 33/11 kv substation.
11 kv and below distribution network.
Approximately 45 X 2 circuit kilometers.
2X56 MVA Power Transformers.
6 substations (10 to 20 MVA each).
40 x 2 ckt kilometers & 40 no.s of 11/0.433 Volt Transformers.

Top
If you are our existing customer please update your details here
 
Power Connection Application Forms
Utility Bill Query
BTS for Vendors
Water Calculator
Water Saving Tips
Energy Calculator
Energy Saving Tips
Solar Roof top Netmetering Policy
National Portal link for RTS


Site Best View in IE6+ with 1024x768 Resolution

Disclaimer | Privacy Policy | Refund / cancellation policy | Sitemap

Tata Steel Utilities and Infrastructure Services Limited