Name of the Client:
Tata BlueScope Steel Limited.
The project is being implemented River Intake Point to cater clarified water requirement for the plants inside coated steel complex, Bara Ash plant.JUSCO has worked here as a EPC contractor.
Brief description of the Project:
The Project comprises of following components to be constructed by JUSCO
Clarified Water System
- Route survey, Design & preparation of construction drawings
- Supply of materials
- Installation, Testing & Commissioning of item/equipment
- Total pipe line D.I. 300 NB 5750 RM
- Laying & erection of pipe – 5.75 KM
Details of Jusco’s Construction Contract:
Contract Value: 2.56 Cr
Contract Duration: 05 months
Date of Completion: Completed 16.06.07
|