Name of the Client:
Tata Steel Limited
Brief description of the Project:
The Project has been taken up for avoiding the perculation of Water results erosion of earth. So the modification of lining, construction of toe wall has been constructed.
The Project comprises of following components to be constructed by JUSCO
- Survey & construction Drawings.
- Fabrication & Erection of coffer Dam – 222 RM
- Excavation inside the water below 6 meter depth. 400 CUM
- Total R.C.C. quantity 700 CUM
- Hydraulic Testing
Details of Jusco's Construction Contract:
Contract Value: 1.28 Cr
Contract Duration: 12 months
Date of Completion: Completed 31.12.2008
|